Bitumen Big Bags

Bitumen Big Bag Supplier for Solid Products

Download, complete, save and email the form to request a B2B quotation.

Bitumen packaging requirements depend strongly on the product form and temperature. Solid pieces, flakes or granules handled near ambient temperature present a different packaging problem from a process that fills or handles material at elevated temperature.

The outer FIBC, inner liner, seams, closures and handling system must be reviewed for chemical compatibility, temperature, target load, storage duration and the customer’s downstream process. A conventional polypropylene FIBC should not be assumed suitable for hot filling unless the specific construction has been tested for that application.

Bitumen big bags are produced with a safe working load of 500 to 2000 kg and a 5:1 or 6:1 safety factor according to ISO 21898. Bags can be supplied in coated or uncoated fabric with optional LDPE or HDPE inner liners.

Safe Working Load (SWL)500 – 2000 kg
Safety Factor (SF)5:1 (single-trip) / 6:1 (multi-trip / heavy duty)
International StandardISO 21898
Raw Material100% virgin polypropylene (PP), UV stabilized
Base Dimensions90×90 cm to 110×110 cm
Filling Height90 cm to 200 cm
Fabric TypeCoated (laminated) / uncoated (non-laminated)
Inner Liner (optional)LDPE / HDPE (form-fit or tube)
Lifting Options1-loop, 2-loop, 4 corner loops, cross-corner loops, tunnel loops

Liner and Temperature Compatibility

For solid bitumen products, a liner may help contain smaller particles and protect the packed material from external contamination or moisture. Film type, thickness, seals and closure must be selected for the product condition and transport environment.

If filling, storage or discharge involves elevated temperatures, the maximum material and surface temperatures, contact duration and cooling profile must be provided. Any requirement for the liner or package to enter a downstream melting process needs explicit compatibility testing and customer approval; it cannot be inferred from a general product name.

Hot-Fill Field Test: 1,000 kg at 110 °C

The images below show an Elay Plastic lined FIBC filled with 1,000 kg of bitumen at 110 °C. The same bag was checked 5 minutes, 2 hours and 2 days after filling. These results apply to the tested construction and filling conditions; each new project is reviewed for its own product, temperature and handling plan.

Project Data Required

Provide the bitumen grade and physical form, filling and maximum exposure temperatures, bulk density, particle size, target net weight, required barrier, filling method, closure method, pallet and container conditions, storage duration and discharge process.

The final construction, safe working load, safety factor and handling instructions must be confirmed through the applicable test and approval process. Where the material is classified for transport, dangerous-goods requirements must be assessed separately before an FIBC is selected.

Custom Production and International Orders

Outer bag and liner construction are customized only after product form, temperature and downstream process are reviewed. Minimum order quantity varies by specification. Production lead time and container-loading options depend on the bag type, order quantity and international delivery plan.

Related information: review custom FIBC inner liners, filling and discharge options, and UN FIBCs where transport classification requires them.

Complete the form and send it to bigbag@elayplastic.com.

Application-Based Design

Construction is reviewed around the product, target load, equipment and supply chain.

Technical Specification

Dimensions, fabric, loops, top, bottom, liner and documentation are defined before production.

Quality Verification

Testing and inspection requirements are agreed for the selected FIBC construction.

B2B Production Support

Quotation and production planning follow the confirmed specification and order quantity.

FIBC Solutions for Solid Bitumen Handling

Bitumen packaging requires a bag system designed around the physical form of the product, filling conditions, cooling, handling and the intended discharge process. Temperature exposure and compatibility of the packaging components must be considered during specification.

The final construction should be agreed from the actual operating conditions, target load, lifting method, storage and transport plan rather than selected only by nominal bag capacity.